Skip to content
MarsLab

AWS to Azure Migration: Where Cost Savings Come From

Where AWS to Azure migration cost savings come from, what a move costs, when it saves nothing, and how to estimate it first.

8 min readPublished Nov 2026

There is no standard saving from an AWS to Azure migration. Savings come from specific levers: licences you already own, right-sized servers, committed capacity, deleted idle resources and managed services. A move saves money when those levers are bigger than the one-off cost of moving. Estimate both sides for your own estate before you commit.

How much can you save by moving from AWS to Azure?

It depends on your workloads, and nobody can honestly quote a percentage without seeing your bill. Two similar companies can see very different results because the same cloud feature is worth more or less depending on what you run.

One real result is on record. MarsLab moved LegalCare, a legal technology platform, from AWS to Azure and cut infrastructure cost by 30 percent, with near-zero downtime. The LegalCare case study does not break that 30 percent down by cause, so treat it as one data point and not a benchmark for your own estate.

Where do AWS to Azure migration savings actually come from?

They come from five places, and only some of them depend on Azure at all. The others are savings you could have made on AWS, which a migration project tends to force you to finally make.

  • Licences you already own, applied through Azure Hybrid Benefit.
  • Right-sizing, which means matching server size to measured use.
  • Reserved capacity, bought for a one-year or three-year term.
  • Removing idle and orphaned resources before you move them.
  • Managed services that replace servers you run yourself.

The first and fourth are the ones most specific to a move. Hybrid Benefit is an Azure product. Idle clean-up is a side effect of having to inventory everything before you migrate it.

How does Azure Hybrid Benefit lower the bill?

Azure Hybrid Benefit lets you bring Windows Server and SQL Server licences you already own, so you stop paying for the licence again in the hourly price. It only helps if you hold eligible licences, so check your agreements first.

Microsoft states that you can save up to 30 percent or more on SQL Database and SQL Managed Instance by using Software Assurance-enabled SQL Server licenses on Azure. That is Microsoft’s own figure for its own product, and it is a ceiling for the licence part of the price, not a promise for your whole bill.

There are conditions. For Windows Server, Microsoft’s licensing page says you need on-premises core licenses from an applicable program with active Software Assurance or qualifying subscription licenses, and that workloads using the benefit can run only during the Software Assurance or subscription license term. If your licences lapse, so does the saving. If you hold none, this lever is worth nothing to you.

Do reserved instances and committed capacity save money after a move?

Yes, if your usage is steady, but you should buy them after the move settles and not before. Committing to capacity you will then shrink turns a discount into a loss.

Azure Reservations help you save money by committing to one-year or three-year plans, and the discount applies automatically to matching resources. AWS offers the same idea under other names. The lever exists on both clouds, so it is not a reason to move on its own. It is a reason to avoid carrying two sets of commitments at once.

Check what you already hold on AWS. Any commitment you bought there keeps billing while you migrate, which feeds directly into the dual-running cost covered below.

Why does right-sizing matter more than the choice of cloud?

Most estates are bigger than they need to be, because servers were sized for a peak that never came or for a guess made years ago. Moving the same oversized servers to a new cloud moves the waste with them.

A migration is a good moment to fix this, because you are already touching every workload. Compare what each server was provisioned with against what it used over a few weeks, and choose the target size from the measurement. Sizing from the old specification is the most common way a migration finishes with a bill that is no lower than before.

  • Measure CPU, memory, disk and network use over a period that includes your busiest days.
  • Size the target from measured peaks with some headroom, not from the source server’s spec.
  • Re-check after a month on the new cloud and adjust again.

How much of the saving is just deleting things nobody uses?

Often a lot, and it is the cheapest saving on this list. A migration forces an inventory, and an inventory finds servers, disks, snapshots and test environments that nobody can explain.

Do this before you migrate, not after. Every idle resource you move costs engineering time to move and then costs money to keep. Anything you delete on AWS also stops billing there, so you capture the saving even if the migration is later delayed. We cannot give you a typical share of spend that is idle, because we have no source we trust for it, and it varies widely between companies.

Can managed services replace servers you run yourself?

Sometimes, and it is the saving with the most upside and the most risk. Replacing a self-run database or queue with a managed one removes patching and on-call work, but it also means re-engineering and retesting.

The LegalCare move is an example of the pattern at small scale. Per the case study, databases moved from AWS RDS to Azure SQL with replication, storage moved from S3 to Azure Blob, and Azure Monitor, Log Analytics and Cost Management were deployed for one view of the stack. These are managed-to-managed swaps, which is the lower-risk end. Moving from a self-run server to a managed service takes more work.

What does an AWS to Azure migration cost?

Four costs sit on the other side of the ledger: running two environments at once, moving the data, re-engineering what does not transfer, and training your people. Price all four before you promise anyone a saving.

  • Dual running: both clouds bill while you migrate and while you keep a fallback, and the overlap lasts as long as your cutover plan needs.
  • Data transfer out of AWS: moving data out of AWS is normally billed as egress.
  • Re-engineering: anything built on AWS-specific services needs rework, such as queues, functions, identity and monitoring.
  • Retraining: your team knows AWS, and the first months on Azure are slower and more error-prone.

Egress is the one most teams underestimate. AWS has a program for this: it offers eligible customers free data transfer out to the internet when they move all of their data off of AWS, either from all eligible accounts or from a particular service. AWS says you contact AWS Support to ask for it, and that credits are provided once approved. Read the terms for your accounts before you plan around it, because it is framed around moving all of your data, not part of it.

When does moving from AWS to Azure not save money?

It does not save money when you hold no usable Microsoft licences, when your workloads are small, or when your costs come from waste that a move would carry over. In those cases fixing AWS is cheaper than leaving it.

  • You have no Windows Server or SQL Server licences with Software Assurance, so Hybrid Benefit gives you nothing.
  • Your estate is built on AWS-specific services, so the re-engineering bill is large.
  • Your spend is oversized servers and idle resources. Right-sizing and clean-up on AWS capture most of that saving without a migration.
  • You are far from the end of an AWS commitment, so you would pay twice during the overlap.
  • Your team has no Azure experience and no time to gain it before cutover.

The honest test is simple. Remove every saving you could capture while staying on AWS. What remains is the saving that belongs to the move, and that is the number to set against the cost of moving.

What else justifies a migration besides cost?

Compliance, identity and tooling fit can justify a move even when the saving is modest. If your organization runs on Microsoft identity and governance, a single stack can simplify audits and access control.

That was part of the LegalCare story. The case study says costs on AWS were climbing, monitoring was fragmented, and compliance requirements pushed the firm toward tighter Microsoft ecosystem integration. Identity and compliance were rebuilt on Azure AD with role-based access control and multi-factor authentication. Cost was one driver among several, and you should be clear about which drivers apply to you before you set a savings target.

How do you estimate the savings before committing?

Build a bottom-up estimate for your own estate: current bill, savings you could take on AWS, savings specific to Azure, and the one-off cost of moving. The move is worth it only if the Azure-specific savings repay the one-off cost within a period you accept.

  • Export the last twelve months of AWS cost by service, and tag what each line supports.
  • List idle and oversized resources, and price the saving from fixing them on AWS.
  • List your Microsoft licences and their Software Assurance dates, and work out what Hybrid Benefit would remove.
  • Estimate dual-running months, egress, re-engineering effort and training for your plan.
  • Compare payback time against the other things your team could do with the same effort.

Microsoft provides tooling for part of this. Azure Migrate helps you assess readiness and the cost of hosting workloads on Azure, and its business case feature helps you estimate the costs and savings of moving. Use it as a starting point, then check its assumptions against your invoices, because a vendor tool reflects the vendor’s pricing model.

How do you keep a live system up during the move?

Replicate first, cut over once, and keep the old environment until the new one has proven itself. Downtime is a cost too, so a plan that saves money but takes the product offline is not a saving.

LegalCare served law firms and could not go dark during the migration. According to the case study, the work used Azure Migrate and Azure Site Recovery, and the databases moved with replication for near-zero downtime. The same engineering applies to any live platform. For the engineering side of moving old systems, see our pages on legacy system migration and platform rebuild and re-platforming.

Who should own the cloud account after the migration?

You should. Whoever runs the migration should leave you with an account, keys and configuration you control, so that you can change supplier or cloud later without asking permission.

This matters because the savings only last if you keep control of the estate. A checklist for testing it is in If you can’t export it, you don’t own it. It is written about AI stacks, but the questions apply to a cloud account as well.

When should you talk to MarsLab about a cloud migration?

Talk to us if you have a live platform that cannot go offline, a bill that keeps rising, and you want the estimate done honestly before anyone commits. MarsLab is an AI engineering firm that places forward deployed engineers inside client teams, and cloud migration between AWS and Azure is among the work we list on our services pages.

If you want a second opinion on your own numbers, get in touch. If the honest answer is that you should stay on AWS and fix the bill there, we would rather tell you that than start a migration that does not pay back.

We want your hardest problems.

We collaborate with ambitious organisations ready to move beyond AI experimentation. If you’re looking to transform how your business operates, we’d love to build with you.

Book an intro call (opens in a new tab)

Thirty minutes with an engineer, not a sales sequence. Pick a slot that suits you.